Fitting out and costing your premises: what to check before the first tile goes on
Share
Save
By Alex Nekrashevich. Facts as of late November 2026. We revise this article as rules and prices change.
Written for anyone who has found a unit and is about to refit it: the professional on a tight budget, the dreamer who wants it to look beautiful, the newcomer to Sweden and the first-timer drawing up a budget for the very first time.
The short version
Whatever you build into a rented unit you will rarely take away. So inspect the unit and the lease first and tile afterwards. Take every figure you have and multiply it by 1.5. Pick taps, toilets and machines made for business use, never the model you have at home. And keep part of the budget back: marketing needs money, and you need a buffer covering six months.
Five checks before anything gets built
- Electrical capacity. How much load can the unit take? In our experience, extra capacity can cost as much as half of the refit. The local grid operator raises it, usually for a connection fee. Get the amount in writing before you sign.
- The electrician. Electrical installation work may only be done by an authorised electrician or by someone covered by an installation firm's self-inspection programme (Electrical Safety Act, section 27). A firm working on other people's installations must be notified to the Swedish National Electrical Safety Board, Elsäkerhetsverket (section 25). Look the firm up in Elsäkerhetsverket's "Kolla elföretaget" search before you hire it. A friend who is handy with wiring will not do.
- Ventilation and extraction. Is there a shaft of your own? Can extracted air be vented outside? A duct, an outdoor cooling unit or a new shop window on the facade generally needs planning permission inside a detailed plan area, and a change to a substantially different use always needs it (Planning and Building Act, chapter 9, section 15).
- Water point and drains. Run the water for a while. One wet wipe is enough to block a narrow old drain. Moving a water point is expensive. If you will cook, ask the municipality about a grease trap before the kitchen is drawn.
- The sign. Since 1 December 2025 signs count as structures, and whether yours needs permission depends on the local plan and the area (chapter 9, section 38). Ask the municipality before ordering it.
More on viewings: Checking commercial premises in Sweden before you rent.
What stays behind with the landlord
Tiles, walls, wiring and windows are fixed to the unit. These improvements normally stay when you leave. If the landlord refuses to renew and you are owed compensation, your spending on alterations only counts where the landlord agreed to them (Land Code, chapter 12, section 58 b). Our own costly lesson with a video studio is told in Commercial lease in Sweden.
Before any work starts, the lease should cover:
- how many months of rent-free period or discount you get while refitting;
- the landlord's written approval of your alterations;
- how long the rent is frozen after your refit;
- who pays for extra capacity and for repairs to shared wiring and pipes;
- whether you must restore the unit when you move out.
The budget: apply a 1.5 multiplier
First-timers budget for "walls and machines". In our experience the hidden costs add at least another half on top. So multiply your final total by 1.5.
What usually goes missing from the budget:
- cleaning up after the builders;
- removing construction waste;
- new circuits for the machines (a bakery oven may run up to 16 hours a day);
- the sign, price labels, a little decor and a chair by the till;
- new locks when you move in;
- small repairs after opening: sockets, taps, toilets;
- fire extinguishers and exit signs.
Do not sink everything into the refit. In our experience the interior and ventilation often swallow the whole budget in cafés and restaurants, leaving nothing for marketing. Afterwards you still need a buffer for at least six months of trading: Money for the start and the first six months.
Business-grade, not domestic
In a café, coffee bar or guesthouse the tap and the toilet get many times the use they would at home. A household model soon breaks. Business-grade fittings cost more but last. Add a budget line for whoever replaces and repairs things too: you will not have time for it all.
Builders and timing
- In our experience, when a builder promises five days you are doing well if it is finished in ten. Rent may already be running while you work.
- Write a detailed brief: what goes where, which colour, how many sockets and where. Otherwise the result will not match the picture in your head.
- Ask for written quotes and a written contract.
- Order signage, cards and leaflets in small batches at first. If anything changes, you would otherwise pay to reprint the lot.
Fire safety: your duty as the tenant
Whoever owns or uses a building must, to a reasonable extent, keep equipment for putting out fires and saving lives and otherwise take steps to prevent fire (Civil Protection Act, chapter 2, section 2). As a tenant you are the user. Put extinguishers and emergency exits into the drawings from the start, and ask the municipal rescue service if you are unsure.
Where not to cut corners
| Do not skimp on (in our experience) | Why |
|---|---|
| Checking power, ventilation and water before the refit | Rebuilding afterwards costs many times more |
| A registered electrician | Faulty installations are dangerous as well as expensive |
| Business-grade taps and machines | Household models fail and keep needing replacement |
| A lease checked before the refit | Otherwise your investment can stay with the landlord and the rent can rise |
| Six months of buffer after the refit | Without it, a beautiful unit closes within a couple of months |
By trade: what to allow for
| Business | Particularly in the budget |
|---|---|
| Coffee bar | Water treatment and filters, capacity for the espresso machine, cooling (the outdoor unit may need permission). Better to lease the machine |
| Café and restaurant | Capacity for hobs and ovens, room for a heavy-duty extractor, a grease trap. Most common mistake: the refit used up the whole budget |
| Bakery and patisserie | Circuits for the oven, extraction the residents above can live with |
| Hairdresser and barber | Dedicated ventilation, water at every chair, capacity for hairdryers |
| Corner shop | A 24-hour shop in Norway that we work with: fridges and freezers running round the clock use a lot of electricity |
| Pet shop | Storage for heavy sacks and easy deliveries |
| Shoe repair and services | A small refit; what matters most is a sign visible from the street |
| Garage and car wash | Oil separator, waste handling, heating tall workshops, water and power |
| Dental and medical practice | Confirm before signing that the unit is suitable: ceiling height, ventilation, water and drains in every room, space for the equipment |
| Hotel and guesthouse | Business-grade taps, air conditioning checked before the season |
Checklist: before the refit starts
| Check | How | Warning sign |
|---|---|---|
| Capacity | An electrician and the grid operator, the amount in writing | You need ovens but the unit only copes with lighting |
| Electrician | Kolla elföretaget at Elsäkerhetsverket | "A mate who knows electrics" |
| Extraction and facade | The municipal planning department | A duct through the facade without permission |
| Water and drains | Flush and run the water yourself | Old drains, or the water point has to move |
| Sign | The local plan, the municipality | The sign ordered before the municipality replied |
| Lease | Rent-free period, written approval, a rent freeze | The lease is silent on all of this |
| Budget | Everything times 1.5 | Nothing left for marketing or a buffer |
| Fire safety | Extinguishers and exits in the drawings | Nobody has thought about it |
| Builder | A written quote and a detailed brief | Everything agreed by word of mouth |
Questions and answers
Electrical installation work may only be done by an authorised electrician or within an installation firm's self-inspection programme (Electrical Safety Act, section 27). Use a firm listed in Elsäkerhetsverket's register.
Search for it in Elsäkerhetsverket's "Kolla elföretaget" service. A firm working on other people's installations must be notified to Elsäkerhetsverket (Electrical Safety Act, section 25).
The local grid operator decides, usually as a connection fee. In our experience it can cost as much as half the refit. Get the figure before you sign.
Yes, if the unit will be used for a substantially different purpose (Planning and Building Act, chapter 9, section 15). Facade changes such as an extraction duct often need permission inside a detailed plan area. Ask the municipality.
Anything fixed to the unit usually stays. If you are compensated when the landlord refuses to renew, alteration costs only count where the landlord agreed to them (Land Code, chapter 12, section 58 b). Get that approval in writing.
In our experience first-timers forget cleaning, waste removal, wiring, the sign, locks and small repairs. Hidden costs tend to add at least another half.
In our experience about twice as long as the builder promises. Negotiate a rent-free period that covers it.
The owner or user must, to a reasonable extent, keep firefighting equipment and prevent fire (Civil Protection Act, chapter 2, section 2). As a tenant, that includes you.
Bought kit sells cheaply later: in our experience an espresso machine fetches a third or a quarter of what you paid. See [Equipment: buy or lease](/en/local-business/start-a-local-business/equipment-buy-or-lease/).
Only so much that money remains for marketing and a buffer of at least six months. Work that out before choosing tiles.
What next
Lease checked and the budget has headroom? Read Equipment: buy or lease, then Money for the start and the first six months.
This is not legal or financial advice. Refit prices vary: ask for written quotes.
Let us look at your location or lease with you
Madloba Consult can review your spot on Google Maps and walk through this guide's questions with you ahead of signing. Legal advice is not part of it. Running a business in Sweden? See For businesses in Sweden.
Find it in the catalogue
Contractors and fit-out firms to ask for quotes:
Share
Save



0 comments
Log in to leave a comment